• galmuth
    link
    fedilink
    English
    arrow-up
    6
    ·
    11 months ago

    the RM “installed gravel on the bridge to a depth of 13 to 16 inches with an average depth of 14 inches, which far exceeded the specified load.”

    WTF, why the hell would they go and dump 16 inches of gravel on the bridge? That’s an awful lot of weight.

    Clearly this guy couldn’t have stopped them dumping gravel after the bridge was completed, but allowing the client to save money on critical safety measures is inexcusable.