[T]he report’s executive summary certainly gets to the heart of their findings.

“The rhetoric from small modular reactor (SMR) advocates is loud and persistent: This time will be different because the cost overruns and schedule delays that have plagued large reactor construction projects will not be repeated with the new designs,” says the report. “But the few SMRs that have been built (or have been started) paint a different picture – one that looks startlingly similar to the past. Significant construction delays are still the norm and costs have continued to climb.”

  • jabjoe
    link
    fedilink
    English
    arrow-up
    1
    ·
    6 months ago

    I get about 450 (as kids bounce on me). It’s not nothing, about the same as Chernobyl alone (many got thyroid cancer but lived). Let alone adding 2314 for Fukushima.