[T]he report’s executive summary certainly gets to the heart of their findings.

“The rhetoric from small modular reactor (SMR) advocates is loud and persistent: This time will be different because the cost overruns and schedule delays that have plagued large reactor construction projects will not be repeated with the new designs,” says the report. “But the few SMRs that have been built (or have been started) paint a different picture – one that looks startlingly similar to the past. Significant construction delays are still the norm and costs have continued to climb.”

  • wewbull
    link
    fedilink
    English
    arrow-up
    2
    arrow-down
    3
    ·
    7 months ago

    Exactly, so you invest the money in renewables.

    • accideath@lemmy.world
      link
      fedilink
      English
      arrow-up
      3
      ·
      7 months ago

      If that’s possible. There are places where neither solar, wind, nor water are viable options to cover all the electricity needs. What do you do then?