• medgremlin@lemmy.sdf.org
      link
      fedilink
      arrow-up
      11
      arrow-down
      1
      ·
      1 年前

      I agree with this idea quite vehemently. Honestly, all ISPs should be seized as public utilities and all necessary utilities should be state or locally run with federal oversight. That includes water, power, gas, garbage/recycling, internet, and potentially even cell phone service. There could be room to argue for premium versions being available should people want to pay for them, but regular access to water, power, high speed internet, and cell connectivity are basic necessities these days. For example, the government run version will get you up to 500mbps reliably, but you have the option to pay a private company for fiber gigabit if you really want to.

        • medgremlin@lemmy.sdf.org
          link
          fedilink
          arrow-up
          6
          ·
          1 年前

          The regulatory parts of the government that don’t get gutted by the conservatives every couple years do better than the corporations. If the FDA and EPA were allowed to have their teeth back, things would be in a much better place overall. The trick is to strip out corporate interest and influence from government.

        • teuast@lemmy.ca
          link
          fedilink
          arrow-up
          4
          ·
          1 年前

          Compared to capitalist corporations, unironically yes. It also has the distinct advantage of not being explicitly profit driven by design.

          The government might not be able to build Estonia-level broadband infrastructure to the whole country overnight, but put it in the hands of capitalists and you get Comcast, and I think I speak for all of us when I say fuck Comcast. Put it in the hands of government, even a local city government, and you get Chattanooga municipal gigabit on a publicly owned fiber network that’s faster and cheaper than pretty much anything you can get anywhere else in the country. Imagine what the USPS could be if we’d given it an ISP division in 2006 instead of doing the IRL Postal Act of 2006.

          • bradorsomething@ttrpg.network
            link
            fedilink
            arrow-up
            4
            ·
            1 年前

            well spoken.

            A friend who used to work at DOE said there were 3 phases of power plant production. First, a government entity takes over the construction, and builds a system that will meet demand for 30 years, at the expense of the tax payers. Then, the infrastructure is sold to private corporations, who promise cheaper rates. The corporations ride the robust design for the full remainder of the 30 years, doing as little maintenance as possible. They then take the earnings and leave the debilitated system, which is picked up by a government entity, who begins doing the work necessary to build a system that will meet demand for 30 years, at the expense of tax payers…

          • Nastybutler@lemmy.world
            link
            fedilink
            arrow-up
            1
            ·
            1 年前

            Notice that your example is local government and not federal. Once the Feds get involved, regulatory capture takes over.

            • teuast@lemmy.ca
              link
              fedilink
              arrow-up
              3
              ·
              edit-2
              1 年前

              Fair with regards to Chattanooga, and regulatory capture is certainly a problem to account for. But I also mentioned the United States Postal Service, whose existence demonstrates that it doesn’t have to be that way.

              E: Also, I shouldn’t neglect to mention that the entities that would carry out regulatory capture on the US government also tried and continue to try it with Chattanooga, and have been unsuccessful, which also demonstrates that it doesn’t have to be that way.