The Biden-Harris administration today announced its approval of the Coastal Virginia Offshore Wind (CVOW) commercial project – the fifth approval of a commercial-scale, offshore wind energy project under President Biden’s leadership.
Also the turbines can be much larger. The blades have to be a single piece, to withstand the forces on it. That obviously causes problems transporting them on land. Modern offshore wind turbine blades are single pieces of over 100m, so longer then a football pitch. However that is not a problem offshore. The reason you want it is that with blade length the energy produced grows exponentially.
Also the turbines can be much larger. The blades have to be a single piece, to withstand the forces on it. That obviously causes problems transporting them on land. Modern offshore wind turbine blades are single pieces of over 100m, so longer then a football pitch. However that is not a problem offshore. The reason you want it is that with blade length the energy produced grows exponentially.