cross-posted from: https://feddit.uk/post/13242302

Hello, I’m hoping to take the instance to 19.4 in the near future.
Before doing this, I need to take pictrs up a few versions.
This will take a while, so while 19.4 is in the works, it won’t happen for a week or so.

Cheers, GA.

  • GreatAlbatrossOPMA
    link
    fedilink
    English
    arrow-up
    1
    ·
    5 months ago

    We took about 34 hours, iirc.

    Flamingos handled it (which was so appreciated), and it was run on a lot of threads.

    Let us know if you want to check anything.