The first two wind turbines have been installed at Dogger Bank A, the first of the three phases of the UK’s 3.6 GW Dogger Bank Wind Farm, the world’s biggest offshore wind farm under construction.
According to a Notice of Operations from the project, the first wind turbine was installed on the 29th of August and the second one was in place a few days ago.
The work on installing the project’s 95 GE Haliade-X 13 MW wind turbines is being performed by Jan De Nul’s jack-up vessel Voltaire which left the Able Seaton Port with the first batch of components and headed to the offshore site at the beginning of last month.
Major offshore construction work, besides the wind turbine installation, continues at the Dogger Bank A site, located 130 kilometres off the east coast of Yorkshire, with the installation of all 95 monopile foundations now completed.
Wow, we live in a Golden Age.