Meanwhile in Germany:

  • @TedZanzibar
    link
    English
    48 months ago

    Very disappointing. I think a large part of that is because up until earlier this year it was basically impossible to get permission for new wind turbines in England. That has now technically changed, but only insofar as it’s now just next to impossible as opposed to actually impossible.

    • @Raxiel@lemmy.world
      link
      fedilink
      English
      18 months ago

      Well that doesn’t help, but installed capacity is over 20GW (well, it was before Dogger bank, it’s probably more now). It was very satisfying last Christmas when high winds, along with mild temperatures, and a lot of shops and offices being closed meant wind was able to cover a substantial amount of the reduced demand. FF generators were under 2GW at one point, pretty much idle standby.