MexM to UK Infrastructure English • 23 days agoNeuConnect, the link under construction between 🇬🇧 and 🇩🇪, is. 1.4GW 725km HVDC link running at 525kV.x.commessage-square0arrow-up18arrow-down11
arrow-up17arrow-down1external-linkNeuConnect, the link under construction between 🇬🇧 and 🇩🇪, is. 1.4GW 725km HVDC link running at 525kV.x.comMexM to UK Infrastructure English • 23 days agomessage-square0