Welcome to this months financial report.

Everything is still ticking along nicely, so I’ll make this short and sweet. If there’s something else you want to know about all this then feel free to ask in the comments.

As can be seen from our graph on Open Collective we got £43.76 in and spent £49.99:

However, that’s not the complete picture - the various outgoings are listed in the spreadsheet but to break it down further:

Hosting remains unchanged (total after VAT €40.68 - £34.74):

  • Server - €29.00
  • IP4 - €1.70
  • Backup box - €3.20

In addition I’ve been reimbursed £10.57 for earlier hosting payments. This is the penultimate one of these. So, after next month the contributions will cover the outgoings.

Since Tom handed over the instance, we’ve largely been focused on ensuring the site is working properly and that the bills get paid. This is now all working smoothly and, as a thank you for sticking with us and generously supporting the instance, we’ve been working on a few things. First up, we’ve added new frontends. We’re looking into other changes and hope to also add some perks for contributors too. With the latter in mind, I will be working through everyone who has donated and linking them to their feddit.uk usernames. If your’s isn’t obvious then contact me either here or on Matrix (the secure message button in my profile).

Previous reports:

  • ᴇᴍᴘᴇʀᴏʀ 帝OPA
    link
    fedilink
    English
    arrow-up
    3
    ·
    4 months ago

    I’m low key impressed how little hardware this all takes tbh

    It’s one of the reasons I wanted to lay all the information out. I want to encourage more subject-specific instances and so demonstrating that it is cheap to run (which makes fundraising doable) could help convince a few people to give it a go. If it helps others with their projects then that’s a lovely bonus too.

    Good plan with the overspeccing, for the price the resiliency is totally worth it!

    It has definitely helped when activity spikes - if we were on the bare bones required, we’d have had issues with uptime. It also means we can put off upgrading for a while - migrating from the old hosting took days. It should be easier moving within the same hosting company but it is still a chore.