• @ThePyroPython
    link
    English
    29 months ago

    The TransPennine rail lines need upgrading desperately, what the hell happened to that upgrade project.

    Whenever HS2 wraps up, the next one should be an east-west high speed link.

    A high-speed through link between Liverpool, Manchester, and Leeds would massively increase growth in the north.